//
Public Deliverables

WP1: Business Models, Use-Case and Requirement Analysis


D1.1: Requirements and Use Case Specification

342 downloads

This document lists the requirements and use cases of the BESOS project found during the require-ments analysis phase.

D1.2: BESOS Business model

613 downloads

This document describes the business models to be promoted by BESOS with the analysis of world-wide existing approaches and special care to the needs triggered by the pilot sites.

D1.3: Key Performance Indicators

281 downloads

This document is a short report in the Key performance indicators to be used within the project.

WP2: Architecture for Energy Positive Smart Cities


D2.1.1: Reference Architecture and Data models V1.0

1130 downloads

This document provides BESOS reference architecture and BESOS common information model taking into account requirements and related use cases defined in D1.1. “Requeriments and Use cases specification”.

D2.1.2 Reference Architecture and Data Models v2.0

1141 downloads

This document provides the updated version of BESOS reference architecture and BESOS common information model taking into account requirements and related use cases defined in D1.1. “Requirements and Use cases specification” and the review results for the 1st version of the Deliverable.

D2.2 BESOS architecture and transferability roadmap to other smart cities

705 downloads

This document provides the final version of BESOS reference architecture and BESOS common information model. It also introduces the next steps to transfer this architecture to other smart cities.

WP3: Open Trustworthy Energy Service Platform


D3.1: Design and Specification of the OTESP

1292 downloads

The Design and Specification of the OTESP, describes the Open Trustworthy Energy Service Platform that is going to be developed in work package 3 in the BESOS project. This deliverable is the only textual deliverable of WP3, while the other deliverables in this work package are implementation deliverables which describe the developed prototypes. This deliverable takes the overall project view – which was created in D2.1.1, the Reference Architecture and Data Model – and the requirements – created in D1.1, the Use Cases and Requirements document – as an input and describes the OTESP. The OTESP is the central communication platform of the BESOS project and handles the interaction between the different components in the BESOS project. Possible components are EMS gateways on the one side and business cockpits (which monitors and manages EMSs) on the other side. This document describes how the communication between the components is performed and how it is secured. This deliverable provides an important input for the other work packages which are designing and implementing other components, since they will all interact with the OTESP.

WP4: Gateway for the connection different EMS to the Open Trustworthy Energy Service Platform


D4.1EMS Adaptation Plan

1094 downloads

This document contains the adaption plan and the adaption strategy of the EMS demo sites of the BESOS platform.

D4.3 Guidelines for transferability of EMS adaptation strategies

499 downloads

This document accompanies the second prototype release of the adapted EMS in the third phase regarding to the D4.3 “EMS adaption plan”.

WP5: DSS Cockpit and Business Balanced Score Card Integration

No public deliverables available.

WP6: Demonstration of the results




D6.1.1 Local Integration activities and Data gathered for Evaluation v1.0

951 downloads

This deliverable reports the validation of the different systems developed in the previous work packages and their use by the BESOS pilot sites – the cities of Barcelona and Lisbon.

D6.1.2 Local Integration activities and Data gathered for Evaluation v2.0

1058 downloads

This deliverable reports the validation of the different systems developed in the previous work packages and their use by the BESOS pilot sites – the cities of Barcelona and Lisbon.

D6.2 Demonstration Activities

179 downloads

The aim of this document is to provide a short overview of the demonstration activities carried out involving the two main pilot sites of BESOS i.e. the city of Barcelona in Spain, and the city of Lisbon in Portugal. This document should be seen as complementary to more detailed efforts listed in the publicly available documents D1.1 D6.1.1, D6.1.2, D7.2 and D8.3.

WP7: Results assessment and conclusions


D7.1 Ex-Ante Analysis and Baseline Definition

580 downloads

This report describes the ex-ante evaluation for “screening the landscape” before deployment and evaluation of BESOS platform. The analysis is clearly linked to the pilot sites tackled at the project, taking also into consideration the internal evaluation plan as defined within Task 7.1

D7.2 BESOS Evaluation and Assessment

184 downloads

This document provides BESOS project Evaluation Analysis. This version focus on the impact assessment analysis of the project along with the evaluation of user experience as considered through the demonstration period of BESOS project.

D7.3 Technical Dissemination and Exploitation

177 downloads

This document provides the Technical Dissemination and Exploitation of BESOS project outcomes, focusing on the technical evaluation of the components that consist of the project framework and further on the business evaluation of BESOS platform

WP8: Dissemination and Exploitation of Results

D8.3 Dissemination Actions

9 downloads

The aim of this document is to provide a short overview of the dissemination activities carried out during the project. This document includes the comprehensive list of events where the project has been presented, papers published and other dissemination materials prepared and used during the life time of the project.
This document should be seen as complement to the information presented at the Demonstration Report D6.2 and as an extension of the Dissemination Master Plan (D8.4)

WP9: Project Coordination

No public deliverables available.